October 2023
HLI Rail & Rigging, LLC was asked to assist the buyer of a 225,000 lb. boiler that was in the HLI Laredo storage facility. The boiler had to be loaded out, transported 15 miles to the Laredo rail yard, then railed 1,650 miles to its final destination Northern Wisconsin.